BPC Insights

Planning Commercial Signage in Houston: Permits, Landlord Rules and Installation

Published · BPC Development LLC

A new storefront isn't finished until the sign goes up. Signage tells customers you're open and helps them find you, but it's also one of the parts of a buildout that gets rushed or overlooked. Signs often need their own permits, must meet landlord sign criteria, and sometimes require electrical work and structural support that should be planned during the buildout, not after.

This guide walks through the planning steps for commercial signage in Houston. It is general information, not legal advice. Sign rules vary by location and change over time, so confirm requirements with the city or other jurisdiction and review lease terms with your attorney.

Common sign types

Each type may be treated differently by the city, landlord and any deed restrictions.

Start with the lease and landlord criteria

In shopping centers and office buildings, the landlord usually controls signage through sign criteria in the lease. These rules may cover:

Get the landlord's written approval before ordering a sign. Our guide to landlord work vs tenant work letters explains how buildout responsibilities are often divided. Review lease terms with your attorney.

City permits

Inside the City of Houston, many permanent signs require a sign permit, and electrical signs typically also need electrical permits. The Houston Permitting Center can explain current sign permit requirements, application steps and inspections. Requirements can depend on the sign type, size, location and zoning of the site, including whether the property is along certain roads or in special districts.

Outside city limits, other jurisdictions may have their own rules. Properties near state highways may also face Texas Department of Transportation rules for certain signs.

Our guide to the buildout permit process in Houston explains the general permit sequence for commercial projects.

Deed restrictions and special districts

Houston doesn't have traditional zoning, but deed restrictions, development rules and special districts can affect signage. Some commercial areas have their own design rules. The City of Houston Planning and Development Department has information on development regulations. Check the property's restrictions before designing a sign.

Plan electrical during the buildout

Illuminated signs need power, and the best time to plan it is during the buildout:

Adding sign power after walls and ceilings are finished costs more and can damage new finishes. Our guide to commercial electrical service upgrade planning covers capacity questions.

Structural support and mounting

Signs add weight and wind load to the building:

Houston's storms and hurricanes make proper anchoring important. The National Weather Service has hurricane and severe weather information.

Accessibility and site considerations

Monument and freestanding signs should not block sidewalks, accessible routes or sight lines for drivers. Federal accessibility guidance is at ADA.gov, and Texas has its own accessibility program administered by TDLR. Review site placement with your design professional.

Storefront and window graphics

Window graphics and storefront signs often need landlord approval and may count toward allowed sign area. Plan them alongside your storefront work. Our storefront and facade refresh checklist covers storefront choices.

Temporary signs

Grand opening banners and coming soon signs may have their own rules about size, placement and how long they can stay up. Check with the city and your landlord before putting one up.

Sign removal at move-out

Leases often require tenants to remove signs and repair the wall at move-out. Removal can leave holes, stains and exposed wiring. Plan for this in the lease and at the end of the term. Our guide to turnover timeline planning between tenants covers what happens between occupants.

Coordinate the schedule

Sign fabrication and permits can take time. To have the sign ready for opening:

Our guide to commercial construction schedule phases explains how signage fits into the overall timeline.

Common mistakes to avoid

Quick checklist

Good signage starts with good planning. When the sign, the permits and the buildout are coordinated, the sign goes up on time and stays up through Houston weather.