Planning a Standby Generator for a Houston Commercial Property

Published · BPC Development LLC

Houston property owners know what a long power outage can do. Hurricanes, tropical storms and winter freezes have left buildings dark, kept tenants out of their spaces and allowed heat, humidity or frozen pipes to damage property. For many commercial and multifamily owners, a standby generator has moved from a nice-to-have to part of the capital plan.

A generator project is more than buying equipment. It involves deciding what the building truly needs to keep running, finding a safe place for the unit, connecting it properly to the electrical system and keeping it ready for the day it is needed. This guide walks owners and property managers through the planning steps. It is general information; your electrical engineer, electrical contractor and general contractor will confirm what applies to your property.

Start with what needs power

The biggest decision is what the generator should carry. Common options:

Make a list of what must run, what would be nice to run and what can wait. That list drives the size, cost and location of the system.

Know the standards involved

Emergency and standby power systems are generally covered by NFPA 110, the Standard for Emergency and Standby Power Systems, along with the electrical code, NFPA 70. Your electrical engineer will determine which requirements apply based on what the generator serves and the building's occupancy.

Permits in Houston

In the City of Houston, the Permitting Center's Generator Permit page explains that registered electrical contractors who install a standby generator must apply for an electrical permit, and that plan review and inspection are required. Depending on the project, the concrete pad, fencing, gas piping and site work may need their own permits or reviews. Our guide to the buildout permit process in Houston explains how commercial plan review generally works.

Choose the fuel

Ask your engineer to compare how long each option can run, what it takes to keep fuel available during a storm and what maintenance each needs.

Pick a safe location

Location matters as much as size:

Transfer switches and the electrical system

The transfer switch is what moves the building from utility power to generator power. Your engineer will decide whether you need automatic or manual switching, how many switches are needed and how they connect to existing panels. Older buildings may need electrical upgrades to make that connection safely. Our guide to commercial electrical service upgrade planning covers capacity reviews and utility coordination with CenterPoint Energy.

Multifamily considerations

Apartment owners often focus on:

Communicate clearly with residents about what the generator will and will not power so expectations are realistic during an outage.

Pair it with storm planning

A generator works best as part of a broader storm plan. Our guides to hurricane prep for rental properties and freeze prep for Houston rental properties cover the other steps owners take before and after severe weather.

Testing and maintenance

A generator that has not been tested may not start when needed. Plan for:

Assign someone on the property team to own the schedule and keep records.

Questions to ask bidders

Quick checklist