BPC Insights

Make-Ready Scope of Work: What It Should Include

Published · BPC Development LLC

Every turn starts with the same question: what does this unit need before the next resident moves in? A written make-ready scope answers it the same way every time, so nothing gets missed and vendors price the same work.

What a make-ready is (and isn't)

A make-ready restores a unit to rentable condition between residents. It's not a renovation. If you're upgrading finishes, see Apartment and Rental Unit Renovation.

What a scope should include

Walls and ceilings

Patch holes, repair drywall damage, and paint or touch up.

Floors

Clean, repair or replace damaged sections, and note transitions and trim.

Kitchen and bath

Fixtures, faucets, caulk, cabinet doors and hardware, and countertop damage.

Doors, windows and hardware

Locks rekeyed or changed per your policy, door operation, blinds and screens.

Systems check

Lights, outlets, smoke alarms, HVAC filter, water heater and plumbing leaks.

Cleaning

Final clean after work is done.

How to write it

Why a written scope matters

It lets you compare vendors on the same work, makes invoices easy to check, and gives you a record for deposit decisions. For repairs beyond a standard turn, see Property Maintenance Contractor for Houston Landlords.

Get a turn scoped

BPC Development LLC handles make-ready and repair work for landlords and property managers across Greater Houston. Call or text (281) 301-4737 for a free on-site estimate.

Call (281) 301-4737Get a free estimate