Planning a Server Room or IT Closet Buildout in Houston

Published · BPC Development LLC

Most businesses depend on network equipment, phone systems, security systems and, in some cases, on-site servers. That equipment often ends up in whatever closet is left over after the floor plan is done. A leftover janitor's closet with no cooling, a shared circuit and a water heater nearby is a common recipe for outages. Planning a server room or IT closet as part of a buildout costs less than retrofitting one later.

This guide covers what Houston businesses and landlords should plan for a server room or IT closet buildout.

This page is general information, not engineering or design advice. Work with your IT team, architect and engineers on your specific project.

Start with the IT team

Before designing the room, ask the IT team or provider:

A small office may only need a wall-mounted cabinet in a ventilated closet. A larger company may need a dedicated room with racks, cooling and backup power. Industry references like the Uptime Institute's tier classifications help frame reliability goals, even though most office IT rooms are far simpler than a data center.

Location

Choose a location that is:

Cooling

IT equipment produces heat around the clock. Building HVAC often shuts down at night and on weekends, while IT equipment keeps running. Plan:

In a Houston summer, an uncooled closet can overheat quickly. Our guide to commercial rooftop HVAC replacement planning covers building HVAC questions.

Power

Plan:

Electrical work should follow the electrical code, such as NFPA 70. Our guide to commercial electrical service upgrade planning explains when the building's service needs an upgrade.

Backup power

Houston storms and outages make backup power a real consideration. A UPS covers short outages. For longer outages, some businesses connect the IT room to a standby generator. Our guide to commercial standby generator planning explains generator options.

Fire protection

Fire protection for IT rooms varies. Many rooms use the building's sprinkler system; some businesses add special fire suppression. NFPA 75 covers protection of IT equipment, and NFPA 13 covers sprinklers. Fire alarm and detection may tie into the building system under NFPA 72. The Houston Fire Marshal's Office may review plans. Our guide to commercial fire sprinkler retrofit planning explains sprinkler changes.

Security

CISA's physical security resources offer general guidance. Our guide to commercial building security and access control upgrades explains options.

Cabling pathways

Plan cable paths from the IT room to every workstation, conference room, camera and access point:

Coordinate cabling with the IT team and the electrical contractor before ceilings close, because adding pathways after drywall and ceiling grid are finished is slower and more disruptive. Ask the cabling installer for test results and a labeled map of every drop.

Room finishes

Space for growth

Leave room for more equipment and clearance around racks for technicians. Expanding a closet later is disruptive.

Landlord and lease questions

Our guide to landlord work vs tenant work letters explains common divisions of responsibility. Your attorney should review the lease.

Permits

Electrical, mechanical and fire protection work usually needs permits. Inside city limits, permits run through the Houston Permitting Center. Our guide to the buildout permit process explains what to expect.

Coordinating with the buildout

IT rooms touch many trades, including electrical, HVAC, fire protection, low-voltage and security. Bring the IT team into design early. Our office remodel guide explains how an office project comes together.